Huge efficiency gains
- 4d Monitoring
- Aug 26, 2017
- 1 min read
[vc_row][vc_column css=”.vc_custom_1579694757385{margin-top: -8.8181818182em !important;padding-top: 6% !important;padding-right: 1% !important;padding-bottom: 0px !important;padding-left: 1% !important;background-color: #ffffff !important;}”][vc_column_text css=”.vc_custom_1579087980660{margin-bottom: 20px !important;padding-right: 8% !important;padding-left: 8% !important;}”]
4D Monitoring installation leads to huge efficiency gains at London site.
[/vc_column_text][vc_separator css=”.vc_custom_1575537576035{padding-right: 8% !important;padding-left: 8% !important;}”][vc_column_text css=”.vc_custom_1582727663545{padding-right: 8% !important;padding-left: 8% !important;}”]4D Monitoring has been installed at Swan Lane, a site comprising 60,000 square feet of office space over 6 floors.
Within 5 working days of installation, 4D Monitoring had identified faults with plant equipment, as well as assets running outside of core business hours.
Engineers deployed to the site have since resolved these issues, resulting in a 14% per month reduction in energy consumption. For more information, read the full case study.[/vc_column_text][vc_column_text css=”.vc_custom_1582727625058{padding-right: 8% !important;padding-left: 8% !important;}”]
For more information, call us on 01480 484999
[/vc_column_text][/vc_column][/vc_row]
Comments